Conduit Bending Calculator
Offset, saddle and stub-up bend marks.
Enter your values
1/2in EMT = 5in
Results update instantly as you type — no submit needed.
Results
- Distance between bends
- 12 in
- Multiplier
- 2
- Shrink
- 1.61 in
- Bend angle each end
- 30°
- Add to overall length
- 1.61 in
Quick answer
For an offset, travel = obstacle height × the multiplier for your bend angle (2.0 at 30°, 1.4 at 45°), and shrink is the extra length lost.
travel = depth × multiplier
At a glance
| What it does | Offset, saddle and stub-up bend marks. |
|---|---|
| Category | Engineering |
| Inputs needed | Bend type, Obstacle depth / stub height, Bend angle, Take-up |
| Main output | Distance between bends |
| Formula | travel = depth × multiplier |
| Cost | Free — no sign-up, no download |
How to use the Conduit Bending Calculator
- 1Pick the bend you are making.
- 2Measure the obstacle depth or the stub height.
- 3Choose the bend angle and mark the conduit at the given distance.
Inputs explained
- Bend type
- Choose one of: Offset, Three-point saddle, Stub-up 90°.
- Obstacle depth / stub height(in)
- Enter the obstacle depth / stub height you are working with.
- Bend angle
- Choose one of: 10°, 22.5°, 30°, 45°, 60°.
- Take-up(in)
- 1/2in EMT = 5in
Worked example
Using the values the calculator loads with:
Inputs
- Bend typeOffset
- Obstacle depth / stub height6 in
- Bend angle30°
- Take-up5 in
Results
- Distance between bends12 in
- Multiplier2
- Shrink1.61 in
- Bend angle each end30°
- Add to overall length1.61 in
Frequently asked questions
What is the multiplier for a 30° offset?
2.0 — the distance between bend marks is twice the obstacle depth, with 0.25 in of shrink per inch of offset.
What is conduit shrink?
The length a run loses because the offset travels diagonally; add it to your overall measurement before cutting.